Ongoing

SN Project Title Location & Country Client Name Value of Work Year of Completion Project Description
1 Detailed Engineering Survey, Design of Roads and Report Preparation (DPR) of Roads to Two Lane Standards, Contract ID: PMEU/337159/072/73 DPR2; Total Length of Road = 55 Km. Far-Western Development Region, Darchula District, Nepal DoR, Planning, Monitoring and Evaluation Unit, PMEU, Patandhoka, Lalitpur. 1,650,000.00 June, 2017

– Phase A
– Feasibility Study of Road
– Fixing and selection of most feasible alignment
– Cost estimate & economic analysis and Ranking
– Fixing obligatory points and benchmarks
– Analysis, Ranking, Prioritization and Recommendation of Roads

– Phase B
– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

2 Detailed Engineering Survey, Design of Roads and Report Preparation (DPR) of Roads to Two Lane Standards, Contract ID: PMEU/337159/072/73 DPR 21; 1. Liwang – Madichaur – Ghartigaun – Naauli – Paatihalna – Chautara – Jinawang Sadak, Rolpa, 77km. 2. Patmara Ga Vi Sa Ko Urthu Chautara – Banta Dillichaur Ga Vi Sa Ko Lum Gaun Sadak, Jumla, 25km 3. Dang Duikholi Masina Gholavang Liwang Road, Rolpa, 30km Far-Western Development Region, Rolpa, Jumla District, Nepal DoR, Planning, Monitoring and Evaluation Unit, PMEU, Patandhoka, Lalitpur. 9,762,800.00 June, 2017

– Phase A
– Feasibility Study of Road
– Fixing and selection of most feasible alignment
– Cost estimate & economic analysis and Ranking
– Fixing obligatory points and benchmarks
– Analysis, Ranking, Prioritization and Recommendation of Roads

– Phase B
– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

3 Detailed Engineering Survey, Design of Roads and Land acquisition Survey of various Terai Roads under HRP/3372244/072/73 DPR 53. 1. Hardi – Malangwa – Chhatauna – Bagmati (Badaharwa) 30 Km, in Sarlahi District. 2. Bagmati (Badaharwa) – Phatuwa – Mahespur – Aruwa, 18 Km, in Rautahat District. 3. Aruwa (Kachorwa) – Kalaiya Bara District Border (TRP), 36 Km, in Bara District. 4. Amuwa Madi – Riu Khola, 38 Km, in Chitwan District. Central Development Region, Sarlahi, Rautahat, Bara, Chitwan District, Nepal DoR, Postal Highway Project, Aaloknagar, Kathmandu 60,13,280.00 June, 2017

– Phase A
– Feasibility Study of Road
– Fixing and selection of most feasible alignment
– Cost estimate & economic analysis and Ranking
– Fixing obligatory points and benchmarks
– Analysis, Ranking, Prioritization and Recommendation of Roads

– Phase B
– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

4 Consultancy Services for New Road Construction Supervision and Stage 2 Survey and Design of (i) Sallisalla – Darma; and (ii) Galphagad – Kalika Road Projects in Humla District under Contract No. RAP 3/ 2013/ 2017. Humla District Rural Access Programme - Phase 3, Jawalakhel, Lalitpur 34,006,020.28 January 27, 2014 - January 26, 2017

– Construction Supervision of Rural Road

5 Detailed Engineering Survey, Design of Roads, cost Estimate & Preparation of Detailed Project report [DPR] of roads in Rautahat District; Total Length of Road is 35 Km. Central Development Region, Rautahat District, Nepal DoR, Division Road Office, Chandranigahpur, Rautahat. 1,575,000.00 Sept. 2016

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

6 Detailed Engineering Survey, Design of Roads, cost Estimate & Preparation of Detailed Project report [DPR] of Shantipur – Gwagha – Foksing Road, 27 Km. Western Development Region, Gulmi District, Nepal DDC, DTO, Tamghas, Gulmi 671,220.00 Sept. 2016

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey

7 Detailed Engineering Survey, Design of Roads, cost Estimate & Preparation of Detailed Project report [DPR] of Khaal – Dehimandu – Sharmaali Road, Baitadi, 15 Km. Far-Western Development Region, Baitadi District, Nepal DoR, Planning, Monitoring and Evaluation Unit, PMEU, Patandhoka, Lalitpur. 825,000.00 Sept. 2016

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

8 Detailed Engineering Survey, Design of Jomsom – Chaile Section Of Jomsom Korala Road, Mustang roads; 55Km and Report Preparation (DPR), Contract ID: PMEU/337159/072/73 DPR 8. Far-Western Development Region, Mustang District, Nepal DoR, Planning, Monitoring and Evaluation Unit, PMEU, Patandhoka, Lalitpur. 1,344,000.00 July, 2017

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

9 Detailed Engineering Survey and Design of Highway and Other Structures (for Upgrading to Black topped Standards) Preparation and Cost Estimate & Preparation of Detailed Project report [DPR] of Belkhet Kirtipur, Kailash Khola Bayalpata section of Mid Hill Highway , 35.45 Km. Mid - Western Development Region, Dang, Nepal DoR, Puspalal (Mid Hill) Highway Project Western Sector, Tulsipur, Dang 2,276,950.00 Oct. 2015

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

10 Detailed Engineering Survey, DCP Test, Design of Roads, Concise IEE Preparation and Cost Estimate & Preparation of Detailed Project report [DPR] of Sahajpur-Bogtan-Dipayal Road, 108 Km under Contract No:- 10/DPR/337123. Far-Western Development Region, Doti District, Nepal DoR, Planning, Monitoring and Evaluation Unit, PMEU, Patandhoka, Lalitpur. 3,888,000.00 Aug, 2015

– Phase A
– Feasibility Study of Road
– Fixing and selection of most feasible alignment
– Cost estimate & economic analysis and Ranking
– Fixing obligatory points and benchmarks
– Analysis, Ranking, Prioritization and Recommendation of Roads

– Phase B
– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

11 Consultancy Services for Local Road Asset Management Support (LRAMS), Jhapa District under Contract No. RAP 3/ 2013/ 2016. Jhapa Rural Access Programme - Phase 3, Jawalakhel, Lalitpur 14,176,959.32 February 7, 2014 – May, 2015

– Poject Management and Construction Supervision of Rural Road Maintenance

12 Construction Supervision of Road, Upgrading Works (Package D) of Rajbiraj-Sakhada Road, Rajbiraj-Bhardah Road & Rajbiraj Rupani Road [41.98 Km]. Saptari District. Eastern Development Region, Saptari District, Nepal DoR, Division Road Office No.-5, Lahan Sirha 857850.00 May, 2015

– Rajbiraj-Sakhada road, which is widening /upgrading from single Lane to intermittent lane for rehabilitation /reconstruction of cross drain in this road, design and constriction supervision.
– Rajbiraj-Bhardah Road, Which is pitch repair, upgrading/widening from single lane to intermittent lane with DBSD Finish including rehabilitation/reconstruction of cross drain and
– Rajbiraj-Rupani road, which is widening /upgrading from single lane to intermittent lane with DBSD finish Including rehabilitation/reconstruction of dross drain.
– The total Completed DBST length is 41.98 KM.

13 Monitoring and Evaluation of Road Maintenance Works executed by Road agencies. 26 District, Nepal Roads Board Nepal 19,99,987.00 March, 2015

– To build the indicators that insures clear means of evaluation of road maintenance works (Planning, Programming, Budgeting, Operation, Monitoring and Evaluation, etc) carried out by Road Agencies.
– To ensure the quality of works performed according to the prevailing standards specification of Roads and Bridges / Technical Specification of Agriculture and Rural Roads.
– To analyses the information obtained and interpret the findings towards evaluation of the best performing Road Agencies, provide feedback and recommend effective and efficient process for road

14 Detailed Engineering Survey, Traffic Study, DCP Test, Design, Cost Estimate and Preparation of Detailed Project report [DPR] of Katari Bypass Road for Cosmos Cement Factory, 35 Km in Udaypur District. Eastern Development Region, Udaypur District, Nepal DoR, Division Road Office No. – 5, Lahan Sirha 875,000.00 Feb, 2015

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report

15 Detailed Engineering Survey, Traffic Study, DCP Test, Design, Cost Estimate and Preparation of Detailed Project report [DPR] of Auraiya – Laxminiya – Rampurkhap – Bankul Himalibas Road in Rautahat, 31 Km. Central Development Region, Rautahat District, Nepal DDC, DTO, Gaur, Rautahat 875,000.00 Dec, 2015

– Detailed Engineering Survey
– DCP Test
– Traffic Study
– Pavement Surveys and Investigation
– Geometric Design
– Land Acquisition Survey
– Construction Material Survey
– Road Inventory Survey
– Preparation of Contract Documents
– Concise IEE Study
– Preparation of Detailed Project Report